New construction prewire

Wire it right before the walls go up

Low-voltage prewiring for new homes and remodels, planned with you and your builder.

Planned with your builder

The best time to plan a smart home is before the drywall. We review your plans, mark every speaker, TV, keypad, camera, and access point, and run the wiring while the walls are open. When the house is finished, we come back to install and program the equipment.

  • Plan review with you and your builder
  • Speaker, TV, and keypad locations
  • Network cable to every room
  • Camera, doorbell, and gate wiring
  • Shade and lighting control wiring
  • Labeled, documented cable runs

Ready for today and later

A good prewire costs little compared to opening finished walls, and it keeps your options open for years.

One plan for every trade

We coordinate with your builder and electrician so wiring, outlets, and blocking all land in the right place.

Ready for what you add later

We run extra conduit to the places you might want technology later, so adding a TV or speaker in five years is easy.

Every cable documented

Each run is labeled and mapped, so you and any future technician know exactly what’s in the walls.

A simple process, start to finish

Every project follows the same four steps, so you always know what comes next.

  1. 01

    Walkthrough and design

    We walk the house with you, learn how your family uses each room, and design a system around it. You get a clear proposal with a fixed price.

  2. 02

    Prewire and prep

    We run the wiring, whether the walls are open in a new build or closed in a home you already live in.

  3. 03

    Install and program

    Our technicians install every piece, hide the wiring, and program the system around your routines.

  4. 04

    Handoff and support

    We show everyone in the house how it works, then stay on call for updates, changes, and service.

Questions about new construction prewire

When should we plan a smart home prewire?

Before framing is finished, ideally while plans are still being drawn. That gives us time to plan with your builder and electrician.

Do you work with my builder?

Yes. We work with custom and production builders across the Austin area and join site meetings to keep everyone on schedule.

What happens after the prewire?

Once the drywall and paint are done, we come back to install and program the equipment, usually a week or two before move-in.

Let’s plan your home

Tell us what you have in mind. We’ll walk the house, talk through options, and send a clear proposal with a fixed price.

(737) 303-4921Get a quote